Welcome to the company ! we have many years of professional experience !
rsdzd@pyzyrsd.com +86 513525609655

shandong best desander professional manufacturer corporation

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdzd@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

shandong best desander professional manufacturer corporation
Setts Cubes and Cobbles | Pavingexpert
Setts Cubes and Cobbles | Pavingexpert

With coursework, it's important that the ,vertical, joints are staggered, whether the setts are new and close-jointed or reclaimed and mortar/pitch jointed. Different sett widths help to create a more random and natural appearance to the work. New setts are often supplied in standard widths, but a range of widths can be specified if desired.

DIY Damp Proof Injection | How to Install a Damp Proof ...
DIY Damp Proof Injection | How to Install a Damp Proof ...

Replaster to a minimum of 1.2 metres internally, to our ,specification,, using ,sand, and cement and Rendapruf integral waterproofer. This will prevent ‘salts’ damage to plaster finishes and decorations. Replastering Concentrated Additive for Renders. Replastering is an essential job after inserting a chemical damp proof course.

Septic System Cost Guide and Resource for New Hampshire
Septic System Cost Guide and Resource for New Hampshire

The designer must able to visually inspect the ,vertical, differences of the soil to see soil color changes, and indications of water & roots. This will determine the seasonal high water table (SWHT). The SWHT determines the bottom of the leach field, which must be between 4 and 2 feet above the SHWT, depending on the chosen type of leach field.

TheSamba.com :: Performance/Engines/Transmissions - View ...
TheSamba.com :: Performance/Engines/Transmissions - View ...

16/11/2013, · Many new mechanical ,pumps, put out as much as 7 psi which any needle valve will have problems with. Adding gaskets under the pump will lower the pressure but if you add too many high rpm output may become an issue. Electric ,pumps, also put out more pressure than needed even if they say they only put out 2-5 psi.

How it works? - Vortex Wind Turbine in a Nutshell
How it works? - Vortex Wind Turbine in a Nutshell

The disturbance of the downstream wind current is why regular turbines need to be installed far from each other. This doesn’t affect bladeless wind turbines, any limitation associated with the “wake effect” is avoided. Furthermore, we expect Vortex devices to work better together, feedbacking each other if they have the proper free space around them, which is estimated to be half of the ...

zoosnet.net
zoosnet.net

We would like to show you a description here but the site won’t allow us.

Anti-Termite Treatment - Types Chemicals Prevention and ...
Anti-Termite Treatment - Types Chemicals Prevention and ...

Anti-termite treatment is a chemical procedure carried out for soil, masonry, wood, and electrical fixtures to provide the building with a chemical barrier against the subterranean termites before and after construction. Anti-termite chemicals, pre and post construction treatment, preventive measures, safety, advantages and disadvantages of anti-termite treatment are discussed in this article ...

O Reg 332/12 | Building Code | CanLII
O Reg 332/12 | Building Code | CanLII

8/12/2019, · Class 1 fire sprinkler/standpipe system means an assembly of pipes and fittings that conveys water from the water service pipe or fire service main to the sprinkler/standpipe system’s outlets, is directly connected to the public water supply main only, has no ,pumps, or reservoirs and in which the sprinkler drains discharge to the atmosphere, to dry wells or to other safe outlets.

Renovating your bathroom | Bathroom | B&Q - B&Q | DIY ...
Renovating your bathroom | Bathroom | B&Q - B&Q | DIY ...

Follow standard pipe-laying practice. In ,vertical, piping, the cold pipe goes on the right and the hot one goes on the left. In horizontal piping, the cold pipe goes underneath and the hot one goes on top. Waste water drains. Refer to your plans and work out exactly where you need to install new drains.

2018 INTERNATIONAL BUILDING CODE (IBC) - CHAPTER 18
2018 INTERNATIONAL BUILDING CODE (IBC) - CHAPTER 18

1802.1 General.. Allowable bearing pressures, allowable stresses and design formulas provided in this chapter shall be used with the allowable stress design load combinations specified in Section 1605.3. The quality and design of materials used structurally in excavations and foundations shall comply with the requirements specified in Chapters 16, 19, 21, 22 and 23.

Chat Online Inquiry Email

Business cooperation

+86 513525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City