Sand control pump for oil well

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdgj@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

Sand control pump for oil well
Investigation of Hydraulic Transport of High Concentration ...
Investigation of Hydraulic Transport of High Concentration ...

slurry, transport by this type of ,pump,, the abrasive material did not contact directly with the piston or its sealing. The transported material and the piston are separated by a membrane. The piston is contacting only an oil and water emulsion agent. The second sensitive part ,of slurry, transport piston ,pump, is a ,valve,. Ball valves were used at this

Recommended Pump Suction and Discharge Side Velocities ...
Recommended Pump Suction and Discharge Side Velocities ...

If your 75 gpm setpoint will not change, then the savings for increasing ,pipe, size will only come if the ,pump, impeller size or ,pump, speed can be reduced to provide 75 gpm at a lower head pressure. Be aware that such a large difference in line losses (1 vs 6 psi/100 ft) can significantly affect a flow control ,valve, sizing and operation, if that is what is controlling ,pump, flow.

Plant Layout Pipe Way Design | Design and Engineering
Plant Layout Pipe Way Design | Design and Engineering

Slurry, Blowdown (these lines must be self-draining) Caustic, acid and Phenol (all these services to be self draining) R.V.’s both inlet and outlet Vapour to knock-out pots Heavy products, bitumen, wax ,Pump, suctions Lethal and toxic substances. High point pockets to be avoided in the following lines : ,Pump, …

Installation and use principle of sand pump
Installation and use principle of sand pump

When the ,sand pump, is under no-load start-up, the ,valve, of the outlet ,pipe, should be in the closed state. Special attention should be paid to the fact that the closed state can only run for 1-2min, otherwise the liquid in the ,pump, will boil quickly. Then open the ,valve, on the outlet ,pipe, gradually, and start the ,pump, …

Using a Modified Turian–Yuan Model to Enhance ...
Using a Modified Turian–Yuan Model to Enhance ...

slurry,, the volume concentration ,of slurry, in the ,pipe,, the diameter of the ,pipe,, ... ,pipe, was proposed. ,Calculation, formula, Durand formula, as JJ CJ K vC gD(1) w w D m 2 D 1.5 ... ,pump,, 6. Sludge tank, 7. Control ,valve,, 8. Pressure tapings, 9. Pressure sensor, 10.

Control Valves Basics - Sizing & Selection | Valve | Actuator
Control Valves Basics - Sizing & Selection | Valve | Actuator

For our system, Cv = 150 (1/15) = 38.7 = 39 STEP # 3: Preliminary ,valve selection, The Cv value should be used as a guide in the ,valve selection,, but before trying to match a ,valve, with the calculated Cv value, some other considerations are: Decide what type of ,valve, will be used for a given process characteristic; Never use a ,valve, that is less than half the ,pipe, size; Avoid using the lower 10 ...

SLURRY TRANSPORT AND PARTICLE SETTLING IN ANNULUS …
SLURRY TRANSPORT AND PARTICLE SETTLING IN ANNULUS …

two ,slurry, systems will be referred to as the fine (150 µm – 250 µm) and coarse (425 µm – 500 µm) ,slurry, systems. The ,selection, of the particle sizes was according to the usual practice of a cuttings re-injection process. Dry sieving method was used to prepare the testing samples according to its size.

Completion Operations - Gravel Packing
Completion Operations - Gravel Packing

Velocities of 500 ft/min have been recommended to prevent premature ,sand, outs or roping of the ,slurry, during the pumping operations, but the evidence supporting this criterion is weak. According to this criterion the minimum ,pump, rate required in a 3 1/2inch work string is some 4.5 bbl/min.

Using a Modified Turian–Yuan Model to Enhance ...
Using a Modified Turian–Yuan Model to Enhance ...

slurry,, the volume concentration ,of slurry, in the ,pipe,, the diameter of the ,pipe,, ... ,pipe, was proposed. ,Calculation, formula, Durand formula, as JJ CJ K vC gD(1) w w D m 2 D 1.5 ... ,pump,, 6. Sludge tank, 7. Control ,valve,, 8. Pressure tapings, 9. Pressure sensor, 10.

Centrifugal pumps
Centrifugal pumps

The gate ,valve, initiates the process, stops it and controls the capacity of a heading produced by the centrifugal ,pump,; the pressure gage used to read the liquid head produced by the centrifugal ,pump,. The manometer is installed on the ,pump, discharge ,pipe,; the safety ,valve, protecting the centrifugal ,pump, against water hammers.

Investigation of Hydraulic Transport of High Concentration ...
Investigation of Hydraulic Transport of High Concentration ...

slurry, transport by this type of ,pump,, the abrasive material did not contact directly with the piston or its sealing. The transported material and the piston are separated by a membrane. The piston is contacting only an oil and water emulsion agent. The second sensitive part ,of slurry, transport piston ,pump, is a ,valve,. Ball valves were used at this

(PDF) PIPE-FLO Professional User's Manual & Method of ...
(PDF) PIPE-FLO Professional User's Manual & Method of ...

PIPE,-FLO Professional User's Manual & Method of Solution. Luis G. Download PDF. Download Full PDF Package. This paper. A short summary of this paper. 26 Full PDFs related to this paper. READ PAPER. ,PIPE,-FLO Professional User's Manual & Method of Solution. Download.

Centrifugal pumps
Centrifugal pumps

The gate ,valve, initiates the process, stops it and controls the capacity of a heading produced by the centrifugal ,pump,; the pressure gage used to read the liquid head produced by the centrifugal ,pump,. The manometer is installed on the ,pump, discharge ,pipe,; the safety ,valve, protecting the centrifugal ,pump, against water hammers.

Pump FAQs
Pump FAQs

Because rotary pumps are designed with close running clearances, clean piping is a must. Dirt, grit, weld bead or scale, later flushed from an unclean piping system, will damage and may seize the ,pump,. Figure 3.4.3.11 illustrates ,pipe,-to-,pump, alignment considerations. Piping should be installed on supports independent of the ,pump,.

Plant Layout Pipe Way Design | Design and Engineering
Plant Layout Pipe Way Design | Design and Engineering

Slurry, Blowdown (these lines must be self-draining) Caustic, acid and Phenol (all these services to be self draining) R.V.’s both inlet and outlet Vapour to knock-out pots Heavy products, bitumen, wax ,Pump, suctions Lethal and toxic substances. High point pockets to be avoided in the following lines : ,Pump, …

EBARA All Mighty Pump Model SAL
EBARA All Mighty Pump Model SAL

the ,pump,.. Gauge pressure at ,valve, full-open is the pressure (head) actually required at site. Head required (m)= Gauge pressure (kgf/cm2) Compound specific gravity × 10 ②Excessive liquid is returned to suction pit through by-pass ,pipe, without regulating by ,valve,. By-pass ,pipe Valve, full-open ,Valve, full-open Corrosive characteris tics Approx. pH1~14 6

Completion Operations - Gravel Packing
Completion Operations - Gravel Packing

Velocities of 500 ft/min have been recommended to prevent premature ,sand, outs or roping of the ,slurry, during the pumping operations, but the evidence supporting this criterion is weak. According to this criterion the minimum ,pump, rate required in a 3 1/2inch work string is some 4.5 bbl/min.